Storm damage gutted roadway fill into the Scott River, below left (Note
30” culvert remained in place). County forces replaced in 1999 with
70 foot bridge
ER paid $175,000 of $195,000 Total Project Costs
2 miles of new habitat available for steelhead trout above the bridge
site (below)